Product : Zerto, IT Resilience Platform/7.5, Enterprise
Feature : Recovery History, Reporting, Management
Content Owner:  Herman Rutten
Summary
Advanced
Details
Information about recovery operations (failover tests, moves, and failovers) can be displayed in Recovery Reports under the Reports tab inside the Zerto Management GUI. The information includes the name of the user who initiated the report, which recovery operation, the point in time, protected and the recovery sites involved, when the recovery operation was started, when it ended, the time it took to bring up the VMs in the recovery site, the RTO, whether the operation succeeded or not, the VPG recovery settings, the VM recovery settings, and detailed recovery steps, and any notes added during a failover test. Recovery Reports are always kept, and never deleted. Recovery Reports can be exported to either PDF or Zip.